DOB construction / alteration permits (build-out): New York City restaurant guide
NYC DOB
What it is
The permits for the physical build-out: layout, plumbing, gas, electrical, HVAC, sprinkler, structural, accessibility, signage. Filed by licensed professionals.
When a restaurant needs it
Any space undergoing a build-out or system changes.
How to apply
Filed in DOB NOW: Build by a registered architect / engineer; trade permits pulled by licensed contractors. Every stakeholder needs an NYC.ID account.
Documents you’ll need
- Architectural / MEP plans
- Asbestos ACP-5 or exemption
- Contractor licenses & insurance
- Site-safety docs as applicable
Good to know
Scope drives which trade permits get pulled (plumbing/gas, electrical, sprinkler). Coordinate with the CO / LNO strategy from day one.
Official source
DOB — how filing works · NYC Admin Code §28-112.2 — permit fee schedule