Trade Permits — Electrical, Plumbing, Mechanical/Gas: Nashville restaurant guide
Metro Codes & Building Safety
What it is
Separate permits for electrical, plumbing (including grease interceptor and fixtures) and mechanical/gas work (including hood exhaust and gas appliances).
When a restaurant needs it
After the building permit is issued, whenever electrical, plumbing, HVAC/exhaust or gas work is done.
How to apply
Each licensed trade contractor applies and pays in ePermits once the building permit has been approved.
Documents you’ll need
- Building permit number
- Trade contractor license
- Scope / fixture or equipment counts
Good to know
Trade permits are pulled after building permit approval. Rough and final inspections are scheduled in ePermits.
Official source
Metro Codes — Permitting process (PDF) · Metro Codes fee schedule (PDF)
Answer a few questions about your space and get every permit in order, with a timeline, a cost range, walkthroughs, and every application filled in for you to sign with Open.
Last reviewed 2026-10-06. Guidance only, not legal advice.