Permit guides › Los Angeles › LA-TR-46

Rooftop dining approval (LADBS occupancy/structural review, LAFD exiting, Planning): Los Angeles restaurant guide

LADBS / LAFD / City Planning Confirm with the city

What it is

Putting guests on a roof changes the roof from an unoccupied surface into an assembly space: LADBS must approve the structural capacity, guardrails, two exits and accessibility and include it in the Certificate of Occupancy/occupant load, LAFD reviews exiting and any cooking or heaters, and alcohol or entertainment on the roof needs Planning (CUB) conditions.

When a restaurant needs it

Rooftop seating or bar.

How to apply

Your architect/structural engineer includes the roof deck in the LADBS plan check (change of use/occupancy of the roof) and the LAFD plan review; add it to the CUB application if you serve alcohol.

Documents you’ll need

Fee
Varies — LADBS Permit Fee Calculator; LAFD plan review per fee schedule
Processing time
Follows the building plan check
Renewal
None (occupant load posted)
Who files
Designed and filed by the architect/structural engineer.

Good to know

LADBS does not publish a rooftop-specific bulletin; treat it as a change of occupancy for the roof and raise it at the RSBEP kickoff meeting.

Official source

LADBS — change of use / occupancy requirements · LAFD — fire/life safety plan review

Get your personalized Los Angeles permit plan

Answer a few questions about your space and get every permit in order, with a timeline, a cost range, walkthroughs, and every application filled in for you to sign with Open.

Build my free plan

Last reviewed 2026-10-06. Guidance only, not legal advice.