Permit guides › San Francisco

How to get every restaurant permit in San Francisco

San Francisco is a consolidated city-and-county, so one local government handles everything: SF Planning (zoning and use), the Department of Building Inspection (building and trade permits), SF Department of Public Health Environmental Health (food facility plan check and the health permit), the SF Fire Department Bureau of Fire Prevention, Public Works and SFMTA (sidewalks, parklets, loading), the SFPUC (water, sewer and grease), the Entertainment Commission and the Office of the Treasurer & Tax Collector (business registration). State agencies (Secretary of State, CDTFA, EDD, ABC) apply everywhere in California. If the address is in Daly City, South San Francisco, Brisbane, Sausalito or any other neighboring city, this guide does not apply — those cities and San Mateo/Marin counties have their own building, planning and health offices.

56 permits and licenses across 25 agencies, from business setup to opening day.

Get your personalized San Francisco permit plan

Answer a few questions about your space and get every permit in order, with a timeline, a cost range, walkthroughs, and every application filled in for you to sign with Open.

Build my free plan

Start these early

Key facts

All San Francisco restaurant permits

SF-BF-01California LLC or Corporation formation + Statement of InformationSF-BF-02Federal Employer Identification Number (EIN)SF-BF-03California Seller's PermitSF-BF-04EDD Employer Registration (state payroll tax account)SF-BF-05San Francisco Business Registration Certificate (BAN)SF-BF-06Fictitious Business Name (DBA) StatementSF-BF-07Workers' compensation insurance (mandatory for any employee)SF-BF-08Cal/OSHA Injury & Illness Prevention Program + required workplace postings (state and SF)SF-CR-01Planning approval of restaurant/bar use at the address (zoning check, Prop H 30-day review or Conditional Use)SF-CR-02DBI Building Permit (tenant improvement / alteration)SF-CR-03SFDPH Food Facility Plan CheckSF-CR-04SFDPH Permit to Operate a food facility (health permit)SF-CR-05Certified Food Safety ManagerSF-CR-06California Food Handler Cards (all food employees)SF-CR-07SFPUC FOG program — grease capturing equipment + Food Service Establishment Wastewater Discharge PermitSF-CR-08Recology refuse service + Mandatory Recycling & Composting + food-ware ordinancesSF-CR-09SFFD fire/life-safety plan review & inspection (building permit routing)SF-CR-10DBI final inspections & Certificate of Final Completion (CFC)SF-CR-11Accessibility compliance (ADA / CA Building Code Chapter 11B) + CASp inspectionSF-TR-01Change of use / change of occupancy permit (retail or office → restaurant)SF-TR-02Conditional Use Authorization (Planning Commission hearing)SF-TR-03Trade permits — electrical, plumbing/mechanical (commercial kitchen, hood, gas piping)SF-TR-04Fire sprinkler and fire alarm permits (PermitSF)SF-TR-05Kitchen hood fire-suppression system (SFFD review and acceptance test)SF-TR-06Place of Assembly permit (50 or more occupants)SF-TR-07Open Flame / candle permitSF-TR-08Backflow prevention assembly (SFPUC Cross-Connection Control) + annual testSF-TR-09SFPUC water & wastewater capacity charges (new service, change of use or added fixtures)SF-TR-10PG&E gas and electric service (new or upgraded service, meters, load increase)SF-TR-11Sign permit (Planning + DBI) with electrical permit for illuminated signsSF-TR-12Awning or marquee permit (Planning, DBI, Fire, Public Works)SF-TR-13Historic preservation review — Certificate of Appropriateness (Article 10) or Permit to Alter (Article 11)SF-TR-14ABC Type 41 — On-Sale Beer & Wine, Eating PlaceSF-TR-15ABC Type 47 — On-Sale General, Eating PlaceSF-TR-16ABC Type 48 (On-Sale General, Public Premises) or Type 42 (Beer & Wine, Public Premises) — bars without food requirementSF-TR-17ABC Type 58 Caterer's Permit + per-event catering authorizationsSF-TR-18Responsible Beverage Service (RBS) certificationSF-TR-19Shared Spaces permit — parklet / parking-lane diningSF-TR-20Sidewalk tables & chairs registration (no permit or fee since August 2025)SF-TR-21Minor Sidewalk Encroachment Permit (awning poles, planters, steps, trash enclosures)SF-TR-22Place of Entertainment (POE) permitSF-TR-23Limited Live Performance (LLP) permitSF-TR-24Fixed Place Outdoor Amplified Sound (FPOAS) permitSF-TR-25Extended Hours Premises (EHP) permit — open 2 am to 6 amSF-TR-26San Francisco Tobacco Sales PermitSF-TR-27California Cigarette & Tobacco Products Retailer's LicenseSF-TR-28SFDPH Mobile Food Facility permit (food truck / cart)SF-TR-29Public Works Mobile Food Facility location permit (public street vending)SF-TR-30SFDPH Catering health permit (caterer / catering facility)SF-TR-31CDPH Processed Food Registration (wholesale / packaged food to other businesses)SF-TR-32BAAQMD charbroiler registration (Regulation 6, Rule 2)SF-TR-33DBI Boiler Permit to Operate (large water heaters and boilers)SF-TR-34Public Works Street Space permit (sidewalk/street occupancy during construction)SF-TR-35SF Health Care Security Ordinance (HCSO) compliance — 20+ employeesSF-TR-36Commercial weighing device / point-of-sale registrationSF-TR-37SFMTA yellow commercial loading zone (free) / white passenger zone

Questions owners ask

Who issues what in San Francisco — is there a county layer?

No. San Francisco is a consolidated city-and-county, so Planning (zoning), DBI (building), SFDPH (health permit), SFFD (fire), Public Works and SFMTA (sidewalks, parklets, loading), SFPUC (water, sewer, grease), the Entertainment Commission and the Treasurer & Tax Collector (business registration) are all one government with counters together at the Permit Center, 49 South Van Ness. State agencies — Secretary of State, CDTFA, EDD and ABC — layer on top.

Is my concept a 'Restaurant', 'Limited Restaurant' or 'Bar' under the Planning Code, and why does it matter?

The Planning Code splits eating and drinking places by alcohol: Limited Restaurant (no alcohol), Restaurant (beer & wine, or spirits with meals) and Bar (full liquor as the main business). Each district's use table marks each as P (principally permitted) or C (Conditional Use). Since Prop H most restaurant uses in Neighborhood Commercial districts are P with a 30-day review; Bars, formula retail and the Mission/SoMa NCT districts can still need a Conditional Use hearing.

What is Prop H and does it apply to me?

Prop H (the 2020 Small Business Recovery Act) made most storefront uses principally permitted in Neighborhood Commercial districts, created a 30-day online review and removed the 30-day neighborhood notice for most of them. It did not change the Mission 24th St, Mission St or SoMa NCT districts, and it does not help formula retail (11+ locations), which still needs Conditional Use.

Can my build-out go over-the-counter at DBI?

If every department — Planning, DBI, Fire, Health — can review it in under an hour, yes, and retail-to-retail conversions often do. A commercial use-category change in an NC district, anything needing a Section 311 notice, exterior work on a historic building, a remodel removing over 75% of the walls, or new construction must go through In-House Review in PermitSF with a Planning Project Application.

Beer & wine or full liquor — what's the real difference in San Francisco?

Type 41 (beer & wine with meals) is an original application filed online for $1,135 plus $565 a year, with no quota. Type 47 (spirits with meals) and Type 48 (bar) are quota-limited to one per 2,000 county residents, so you buy an existing license and transfer it through escrow at the ABC district office ($1,565 person-to-person + $975 premises-to-premises); market prices are private and high. Both need a 30-day posting and a 55–65 day investigation, and Planning must sign a Zoning Referral confirming your use category.

Does a bar without a kitchen need a health permit?

Yes. The City's bar guide is explicit that a bar must obtain a Permit to Operate from the Department of Public Health; DPH licenses it as 'Bars/Taverns without food prep'. Bars serving only light snacks avoid full restaurant kitchen requirements, but the plan check still covers sinks and ice.

What annual City fees did Prop M eliminate?

Starting in 2026 the annual license fees TTX bills for restaurants, take-outs, bars, bakeries, caterers, mobile food facilities, Fire Department Places of Assembly and Open Flame use, Entertainment Commission POE/LLP/Amplified Sound permits and Public Works tables & chairs are waived — you still receive the license, at $0. Application fees (DPH $427, plan check, Entertainment Commission applications, SFFD permit fees) still apply, and businesses with $5M or less in SF gross receipts are exempt from the Gross Receipts Tax.

Do I need a Place of Assembly permit?

If your occupant load is 50 or more, yes — an annual SFFD permit ($446, applied for at least 5 business days ahead with the approved occupant-load plan and inspected before approval). The Entertainment Commission will not hear a Limited Live Performance or Place of Entertainment application without it when occupancy is 50+. Table candles in that space add a $436 Open Flame permit.

Can I have live music or play music outside?

Live music, DJs, comedy or karaoke as a side attraction in a performance area of 200 sq ft or less ending by 10/11 pm is a Limited Live Performance permit ($612 application, 30-day notice, Commission hearing). Bigger, later or dance-focused entertainment is a Place of Entertainment ($2,708). Pre-recorded music indoors needs nothing; outdoors on a patio or parklet it needs a Fixed Place Outdoor Amplified Sound permit ($862) and may run only 9 am–10 pm.

Is there a late-night permit?

Not for hours before 2 am — those come from your Planning approval and your ABC license. Serving food, hosting entertainment or running games between 2 am and 6 am on a regular basis needs the Entertainment Commission's Extended Hours Premises permit ($2,708 application), and alcohol must still stop at 2 am under state law.

Can I put tables on the sidewalk or build a parklet?

Sidewalk tables and chairs need no permit or fee since August 2025 — register them with Public Works and keep 6 ft of clear path plus the hydrant, corner and fire-escape clearances. A parklet in the parking lane is a Shared Spaces permit reviewed by SFMTA and Public Works: public parklet $1,186 first space and $119 a year, movable commercial $1,780 per space and $3,559 a year, fixed commercial $2,373 per space and $2,373 a year (FY 2026-27), with 60 days to build after conditional approval.

What will SFPUC charge me on a change of use?

Capacity charges — one-time water and wastewater charges based on meter size and fixture units — apply to new service, changes in building use and added fixtures, and must be paid before DBI issues the permit. The City's own restaurant guide says to estimate them before signing a lease (capacitycharges@sfwater.org, 628-652-6040). You also need grease capturing equipment under the FOG ordinance and backflow assemblies for carbonators and boilers.

Do I need a Certificate of Occupancy?

Only if the occupancy classification changes (retail or office to restaurant, or crossing into A-2 assembly at 50+) or the building is new — SF Building Code §109A requires one for each change in occupancy classification. A tenant improvement that keeps the same occupancy closes with DBI's Certificate of Final Completion.

Can I sell tobacco?

Probably not. San Francisco bans flavored tobacco (including menthol) and all nicotine vaping products, caps tobacco permits by supervisorial district, and restricts new permits near schools. If a permit is available, you need the CDTFA retailer's license first, then the DPH tobacco sales permit — call Environmental Health at (415) 252-3800 before counting on it.

Who helps me for free?

The Office of Small Business at the Permit Center (sfosb@sfgov.org, 49 South Van Ness, 2nd floor) walks owners through the restaurant sequence and publishes the City's Guide to Opening a Restaurant; the Planning counter (pic@sfgov.org, 628-652-7300) answers zoning questions; DBI's TechQ@sfgov.org answers technical permit questions; and SFFD will hold a pre-application meeting on hoods, exits and capacity.