Building Permit (alterations / fit-out): Philadelphia restaurant guide
Philadelphia L&I
What it is
Approval of your construction drawings for the restaurant build-out; it carries the Certificate of Occupancy when the work requires one.
When a restaurant needs it
Any construction, structural, egress or occupancy-changing work (not paint/finishes only).
How to apply
Your design professional files in eCLIPSE with sealed construction documents; the work must be done by a Philadelphia-licensed contractor.
Documents you’ll need
- Construction documents sealed by a PA-registered design professional
- Scope of work and owner info
- Executed lease (if tenant)
- Special Inspection agreement if required
- Pre-approvals (e.g. Historical Commission)
Good to know
PDPH adds a $250 fee if food-equipment installation or interior modification starts before plans are submitted to the Health Department, so submit the PDPH plan review alongside (or before) L&I review.
Official source
L&I — Get a Building Permit · L&I FAQ — When does my construction permit expire
Answer a few questions about your space and get every permit in order, with a timeline, a cost range, walkthroughs, and every application filled in for you to sign with Open.
Last reviewed 2026-10-06. Guidance only, not legal advice.